The electric power needed for the air compressors, water pumps, and mountain lights at Pats Peak is enormous, requiring approximately 4 megawatts under peak load.
Back in the old days Pats Peak had to call up the local power company when were getting ready to make snow, thankfully, because of infrastructure upgrades we do not need to do that anymore.
The beauty of this is we work very aggressively with power company to use this energy when the rest of the state is fast asleep.